PT PJB

Brantas Power Station

Brantas power station operates 12 PLTA spread along Konto River and Brantas River in East Java, most of which  are of Dutch remnant. Every year UP Brantas generates electricity energy approximately 1.033,56 GWh, channelized through Extra High Voltage Air Channel 500 kV to Java-Bali interconnection system. Address: Jl. Basuki Rakhmad 271, Karangkates-Sumberpucung, Malang 65165, telephone: 62-341-385545, 385546, Fax: 62-341-385462

Power Plant Unit

Installed Power

PLTA Sengguruh Unit 1 and 2

2 x 14,5 MW

PLTA Sutami

3 x 35 MW

PLTA Wlingi

2 x 27 MW

PLTA Lodoyo

4,5 MW

PLTA Tulungagung

2 x 18 MW

PLTA Selorejo

4,48 MW

PLTA Mendalan Unit 1

5,6 MW

PLTA Mendalan Unit 2, 3 and 4

3 x 5,8 MW

PLTA Siman Unit 1, 2 and 3

3 x 3,6 MW

PLTA Giringan Unit 1 and 2

2 x 0,9 MW

PLTA Giringan Unit 3

1,4 MW

PLTA Golang Unit 1, 2 and 3

3 x 0,9 MW

PLTA Ngebel

2,2 MW

PLTA Wonorejo

6,5 MW